How to install the transformer automatic soldering machine?
HY-H10 transformer automatic soldering machine installation steps:
1. Take out the soldering machine and place it on a dry, stable, non-corrosive workbench.
2. When using power, first determine the voltage required to use the working power supply voltage for the machine (green light is 220 volts, red light is 110 volts, when no power is applied.)
3. Place the soldering iron in the soldering iron (4) soldering iron frame, insert the soldering iron power plug into the soldering machine socket, and turn on the temperature control switch.
4. According to the needs of your own products, properly select the conduit, insert it into the hexagonal column of the fixed conduit, and fasten it with screws.
5. Place the foot switch in a place where the foot is easy to operate.
Sixth, put the tin wire in the tin seat and introduce the tin guide.